Completed the kid's bike I picked up last week. I struggled with these brakes (and they still need work). I'll be by Thursday to swap. Thanks Kirsty!
-
IMPACTOS135
-
Horas265
-
Grupos1
Sobre
Estadísticas GivePulse
Grupos
Impactos
I completed the bike I picked up yesterday. It does need at least a rear tire (and maybe the front). There's no barrel connector on the front shifter, but I got it shifting just dandy. I may be able to drop it off tomorrow or Saturday. If I do, can I pay for my Keylist order with a check to save a little dough (big order this time)? Thanks.
What better way to spend a rainy afternoon? The bike I picked up from you Thursday is (pretty much) done.
The BB has some play and I don't have the tools to adjust it (found out after removing the cranks). The front wheel & brake still need some work since the brake is rubbing in one spot (on both sides of the rim). I trued the wheel the best I could and still no luck there. I noted both on the card.
I replaced all shifter cables because they were brake cables which affected the shifting.
Front shifter: Of the 3 shifters (2 you gave me, 1 on the bike), the one with the least resistance was the one on the bike. I removed it, disassembled it, cleaned and lubed the inside, and it seems a little easier to twist than before. All shifting is working at about 95% now (probably the best we can hope for on this bike).
I also trued the rear wheel and adjusted the rear brake.
See ya 10/26 or 10/27. Thanks!
Completed bike brought home last week. I can not get the rear wheel back on - had a little struggle getting it off. Will drop it off 10/20 and will learn what to do to get that wheel back on.
Worked on/completed the bike I picked up yesterday. I noted a few things it still needs - mainly front brake pads/hardware. I'll drop it off 10/13 and get another.
Worked on/completed the goodwill bike Josiah gave me last week. It cleaned up pretty well and the color is pretty sweet once the dirt is off! Front brake needs some love, but otherwise it's good to go. I'll drop it off 10/5 or 10/6.
Completed the Huffy I took home 9/8. Good call on this one Kirsty - needed some work, but it was very serviceable and didn't take a ton of time - thanks! Rear shifting still needs help, but I noted that on the card. Will drop it off 9/14/22.
Kirsty, hope you’re having (had?) a great long weekend!
The bike I took home from Kevin last week needed a lot of work. I’ve done as much as I can at this point. I’m hoping you can get this list to Kevin as it will be easier to explain here vs. the little checklist card.
Big time consuming things I did:
- Replaced all cables and housing for brakes and shifters.
- Overhauled headset
- I tried to overhaul the rear hub and free hub, but they still need work (still play in the hub I couldn’t get out). The free hub was really sticky - trying to overhaul it didn’t get me too far as I could never figure out how to get to the bearings. I was able to clean/lube the bearings in the rear hub though. But they still need looked at.
Other things it will need:
New tires.
Maybe grips.
I couldn't get the front shifter to work, even after cleaning and lubing it. It's got a fresh cable, but needs new housing (old housing taped to the frame to use to measure new housing).
The fork seems to have some play and it also has no boots.
Rear hub and free hub per above.
The chain is well worn past the .75 mark on my chain checker.
The rear brake, left caliper needs to be worked on - the cable won’t stay attached to it.
The rear shifter has no cover on it.
If you have any questions, just let me know. Thanks!
|
Joel Zieve
Great, thanks! |
A friend dropped off a bike to donate - a full suspension Huffy. Had to service both wheel hubs and the headset (must have sat outside a while) so it took some time, but it seems to be working pretty well now. Will drop it off later this week.
Completed the partially completed kids bike Kirsty gave to me this past week. It needed more work besides putting on the rear derailleur and the shifting could still be better, but it's as good as I can get it.


Thanks for all your work on the bike, Joel! I'll get all the feedback to Kevin, and we'll get what's needed pulled together for the bike.